The streets division concentrates on maintaining and repairing infrastructure improvements. Typical duties include street and sidewalk repairs (including street sign replacement, pot hole repairs, retrieval of deceased animals from public rights-of-way, and street striping), grounds maintenance, snow and ice removal, brush and leaf pick-up, storm sewer and sanitary sewer main repairs, tree trimming and mosquito control.

Village Infrastructure Road Program

In 2004 the Village adopted a Pavement Management Approach to guide the maintenance of the Village Streets.  Approximately every 5 years all of the roadways in the Village are inspected and the condition of the roadway is rated.  The Village then utilizes a pavement management program to determine the timing and method of repair for streets based on the anticipated funding and year.  The program helps the Village select the most cost effective road repair program.  Generally, the Village tries to group the streets selected for rehabilitation into the same general area to reduce mobilization costs.

Prior to the passage of the 1% local sales tax the Village was able to rehabilitate approximately 1 mile of roadway each year.  This year with the additional funding the Village is able to rehabilitate 4 miles of roadway.  The 2016 road program includes patch sealing and resurfacing as indicated on the project map

At the conclusion of each year’s program Public Works and Engineering reevaluate the current 5-year plan, discuss the program with the Village Board and make any adjustments that are needed for the next year’s program.

In addition, the Village actively seeks Federal funding for rehabilitation of Village streets that are eligible.   In order to be eligible for federal funding the street must be classified as a Federal Aid Urban (FAU) Route by IDOT.  This year (2016) the Village secured funding for the repair and resurfacing of Briarcliff Road which is a designated FAU Route.  For this project the Village is responsible for 25% of the cost, the Federal share is 75%.   

Have a question or concern? Please contact Public Works at 630-896-9241 or email the general public works email box. 